Research Article
Design Change and Operational Consideration of the HVAC System during Nuclear Power Plant Decommissioning
Table 1
HVAC systems reclassified for decommissioning.
| HVAC system | Operation required | Immediate demolition | Modification required | Transition period | Decommission-ing phase |
| Primary | Control room | √ | | | √ | ECCS equipment area | | | √ | | RCB | √ | √ | | √ | RCB purge | √ | √ | | √ | Aux building | √ | | | √ | Compound building | √ | | | | Fuel handling building | √ | | | | C-1E electrical equipment area | | | √ | | ESW intake structure | √ | | | |
| Secondary | Turbine generator building | √ | √ | | √ | Miscellaneous building | √ | | | | Cold machine shop | √ | | | | CW intake structure | √ | | | | Low and medium rad waste interim building | √ | √ | | | Technical support centre | | | √ | |
|
|